Implementation timeline (total months/years)
Implementation timeline (total months/years) Previously implemented (not now)
Implementation timeline (total months/years) Doing now
Implementation timeline (total months/years) Starting soon (next 6 months)
Implementation timeline (total months/years) Starting in next 1-2 years
Implementation timeline (total months/years) Not planned or on radar
Workshop duration (e.g. from 6 hours to 5)
Workshop duration (e.g. from 6 hours to 5) Previously implemented (not now)
Workshop duration (e.g. from 6 hours to 5) Doing now
Workshop duration (e.g. from 6 hours to 5) Starting soon (next 6 months)
Workshop duration (e.g. from 6 hours to 5) Starting in next 1-2 years
Workshop duration (e.g. from 6 hours to 5) Not planned or on radar
Number of workshops (e.g. from 6 workshops to 5)
Number of workshops (e.g. from 6 workshops to 5) Previously implemented (not now)
Number of workshops (e.g. from 6 workshops to 5) Doing now
Number of workshops (e.g. from 6 workshops to 5) Starting soon (next 6 months)
Number of workshops (e.g. from 6 workshops to 5) Starting in next 1-2 years
Number of workshops (e.g. from 6 workshops to 5) Not planned or on radar
Depth of SEM content (e.g. going "below" the CEE Minimum Elements)
Depth of SEM content (e.g. going "below" the CEE Minimum Elements) Previously implemented (not now)
Depth of SEM content (e.g. going "below" the CEE Minimum Elements) Doing now
Depth of SEM content (e.g. going "below" the CEE Minimum Elements) Starting soon (next 6 months)
Depth of SEM content (e.g. going "below" the CEE Minimum Elements) Starting in next 1-2 years
Depth of SEM content (e.g. going "below" the CEE Minimum Elements) Not planned or on radar
EMA duration (e.g. requiring 1 hour or less)
EMA duration (e.g. requiring 1 hour or less) Previously implemented (not now)
EMA duration (e.g. requiring 1 hour or less) Doing now
EMA duration (e.g. requiring 1 hour or less) Starting soon (next 6 months)
EMA duration (e.g. requiring 1 hour or less) Starting in next 1-2 years
EMA duration (e.g. requiring 1 hour or less) Not planned or on radar
M&V rigor (e.g. requiring lower statistical metric thresholds)
M&V rigor (e.g. requiring lower statistical metric thresholds) Previously implemented (not now)
M&V rigor (e.g. requiring lower statistical metric thresholds) Doing now
M&V rigor (e.g. requiring lower statistical metric thresholds) Starting soon (next 6 months)
M&V rigor (e.g. requiring lower statistical metric thresholds) Starting in next 1-2 years
M&V rigor (e.g. requiring lower statistical metric thresholds) Not planned or on radar
Technical Opportunity Assessments (e.g. shortening these)
Technical Opportunity Assessments (e.g. shortening these) Previously implemented (not now)
Technical Opportunity Assessments (e.g. shortening these) Doing now
Technical Opportunity Assessments (e.g. shortening these) Starting soon (next 6 months)
Technical Opportunity Assessments (e.g. shortening these) Starting in next 1-2 years
Technical Opportunity Assessments (e.g. shortening these) Not planned or on radar
SEM tools (e.g. easier templates)
SEM tools (e.g. easier templates) Previously implemented (not now)
SEM tools (e.g. easier templates) Doing now
SEM tools (e.g. easier templates) Starting soon (next 6 months)
SEM tools (e.g. easier templates) Starting in next 1-2 years
SEM tools (e.g. easier templates) Not planned or on radar