Skip to main content

Linden Street Renovation Project#

Image of Linden Street at night with people visiting

Based on input from the community about how they would like to utilize Linden Street into the future, the City is piloting an activation plan for the 200 block of Linden Street in 2024.

Through the summer of 2024, in tandem with monthly First Friday Art Walks, Linden Street, from Walnut Street to Jefferson Street, will be closed to vehicular traffic and the road opened up as a pedestrian corridor. Businesses on Linden Street will be able to utilize frontage during these times. Current patio and alcohol service regulations will remain in effect. 

Additional Linden Street special event closures currently scheduled in 2024 are:

  • Global Sounds 5/18/24
  • Artisan Street Fair 6/29/24
  • Fort Collins Art Festival 8/3/24 and 8/4/24
  • Artisan Street Fair 8/31/24
  • Artisan Street Fair 10/26/24
  • Holiday Lighting Ceremony 11/1/24. 

Overview#

Map of Linden Street project area

Location Map

The Linden Street Renovation project turns Linden Street between Jefferson and Walnut Street into a “convertible street"—a roadway that can be closed to vehicular and bicycle traffic and transformed into a pedestrian gathering space during special events.

To accomplish this, the City planned significant urban design and landscaping improvements, gateway elements, roadway/pedestrian improvements, and utility improvements. The conceptual design phase was completed in 2014 and the final design was completed in 2019.

Construction was originally planned for 2020, with the entire project built at once. However, due to the onset of the COVID-19 pandemic, the City postponed construction and ultimately broke the project into two phases. This was done in part to mitigate as much disruption as possible to the business community.

With construction and modifications to Linden Street now complete, it stands ready to serve as a convertible street. The City will be pilot-testing its functionality with temporary conversions (referred to as "activations") for special events in 2024.

Linden Street Activation - Business Survey#

Do you own or manage a business located on the 200 block of Linden Street?  The City is interested in your opinion about the timing of activations (vehicular traffic closure/conversion to pedestrian mall) on Linden. Four different schedules are being considered:

  • 3 p.m. Friday to noon Saturday
  • 5 p.m. Friday to noon Saturday
  • 3 p.m. Friday to 8 a.m. Saturday
  • 5 p.m. Friday to noon Saturday.

Using the form below, please let us know if you have a strong preference for or against any of the options shown. 

The form could not be submitted. Please re-load the page and try again.

Contact#

Dillon Willett | Project Manager – Civil Engineer II | dwillett@fcgov.com

Michael Bussmann | Business Support Liaison | mbussmann@fcgov.com